Reutterwerk
Go Back   Reutterwerk > All Albums > Leslie 928 S2's Profile > Albums

 
928 S2/S4 Project - Part 1 (12/17/08-1/20/09)
Installing an 88 S4 engine, fuel management and drivetrain into an 85 Euro, and supercharging with setup converted from 16 v engine (Powerdyne)
Intercooler location (1/20/09)
Intercooler location (1/20/09)
Intercooler location (1/20/09)
Intercooler location -- starting to fit hoses (1/20/09)
Tight intercooler clearance (1/20/09)
Heat wrap on exhaust pipe and 2000 degree (ambient) heat barrier on intercooler - note intercooler location (1/20/09)
Heat wrap on exhaust pipe and 2000 degree (ambient) heat barrier on intercooler (1/20/09)
Damn Cold! (1/16/09, 12:00 pm)
Fans and intercooler radiator test fitted (1/13/09)
Fans and intercooler radiator test fitted (1/13/09)
New injectors installed on one rail (1/12/09)
Injectors new and old (1/12/09)
Injectors new and old (1/12/09)
T-bolt hose clamps (1/12/09)
Intercooler radiator has large fin to water passage ratio for superior cooling (1/12/09)
Radiator is 12" x 24" (1/12/09)
Intercooler 12.25" x 12.00" x 4.50" (1/12/09)
New intercooler kit (1/12/09)
End of day -- it's getting pretty packed in there, but there are still a few largish holes to fill up with "stuff"  :D (1/7/09)
End of day (1/7/09)
New jump post installed, and wiring mostly cleaned up (1/7/09)
New jump post (sort of) with the wires tinned (soldered) in preparation for installation -- better than the broken shorted out one (1/7/09)
Old jump post and attendant wiring mess (1/7/09)
Old jump post and attendant wiring mess (1/7/09)
New variable fan controller (1/7/09)
 

All times are GMT -4. The time now is 01:44 AM.

Kirsch designed by Andrew & Austin


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
DTO Garage vBulletin Plugins by Drive Thru Online, Inc.
Copyright © 2008 - 2024, Reutterwerk.com